Valley Southwoods Construction Updates

  • Valley Southwoods Construction Projects

    Valley Southwoods serves approximately 720 students all in ninth grade. We like to say students begin the year with a “fresh start” and start building a resume that will help them succeed in high school and beyond. Teachers provide high-quality instruction with the unique needs of ninth-graders in mind. They create lessons that are relevant and challenging and provide support to help all students learn.

    Project List

    • 2022 building addition, remodel, ICC-500 storm shelter and secure vestibule at main entry
    • Replace doors
    • Reseal windows
    • Replace flooring
    • Infill media center doors
    • Renovate elevator cab
    • Renovate locker rooms
    • Renovate restrooms
    • Replace kitchen and corridor ceilings
    • Replace classroom millwork
    • Replace locker locks
    • Add building wide voice annunciation
    • Replace interior and exterior lighting systems with LED
    • Replace power panels
    • Add cooling to IDF
    • Replace sound systems
    • Update clock and intercom systems
    • Replace chiller ad cooling tower
    • Replace dishwasher booster heater
    • Repair and replace concrete
    • Tuckpointing

Project Photos

Valley Southwoods Flooring

  • Address 

    625 South 35th Street
    West Des Moines, IA 50265-2053


    Contact

    PHONE: 515-633-4500 
    FAX: 515-633-4599 


    School Times

    HOURS: 8:20 a.m.-3:20 p.m..
    COLLABORATION SCHEDULE: Wednesday 8:20 a.m.-2:35 p.m.


    Grades Served

    9


    Principals

    Mitch Kuhnert, principal
    Haley Hockensmith, assistant principal