Construction Projects
Page Navigation
- Construction Projects
- Construction Updates for Clive
- Construction Updates for Crestview
- Construction Updates for Crossroads Park
- Construction Updates for Fairmeadows
- Construction Updates for Hillside
- Construction Updates for Indian Hills
- Construction Updates for Jordan Creek
- Construction Updates for Western Hills
- Construction Updates for Westridge
- Construction Updates for Stilwell
- Construction Updates for Valley Southwoods
- Construction Updates for Valley
- Construction Updates for Walnut Creek
- Other WDMCS Building/Property Construction Updates
Valley Southwoods 10-Year Plan
-
10-Year Plan: Valley Southwoods Projects
As part of the current 10-Year Facilities Master Plan, significant additions and remodeling will occur at Valley Southwoods Freshman High School.
- Provide Career and Technical Education (CTE) spaces.
- Addition will have an ICC-500 rated structure to protect the entire building population in the event of a weather-related emergency.
- Update the food service kitchen and improve efficiencies in the space.
- Create additional collaboration spaces.
- Renovate the main entrance to create a secure entry.
- Update the outdoor courtyard.
Architect: Shive-Hattery
Timeline: Summer 2021 - Summer 2024
Floorplans
-
Valley Southwoods Projects Floorplan
This floorplan shows all areas that will be renovated or added.
- Orange area: Update the food service kitchen and add a culinary arts lab, including space for food preparation and a pantry.
- Yellow area: Renovate the main entrance to include a secure entry.
- Dark Blue areas: Transition the media center into an odeum, a small theater space that can be used for performances and education. A smaller book depository will be created to house current media center materials.
- Green area: Addition to Valley Southwoods dedicated to Career and Technical Education (CTE) programming. It is currently designed to include numerous labs and a presentation hall. This addition will also be constructed to house the entire student/staff population in the event of a weather-related emergency.
Last Modified on August 29, 2023