Hillside Elementary Construction Updates

  • Hillside Elementary Construction Projects

    Hillside Elementary is located in the Historic Valley Junction neighborhood and emphasizes our four pillars of Respect, Responsibility, Safety, and Caring. As we partner with families and community members, we strive to provide educational opportunities that will prepare our students for post-secondary training, careers, and life beyond Hillside. Our staff seeks to engage students at a deeper level of inquiry and understanding that can be achieved with strong educational approaches. We believe that engaging academics, positive community, culturally-responsive teaching and family partnerships will help our students be successful in their life journey.

    Project List

    • 2023 building addition and remodel including ICC-500 storm shelter
    • Replace classroom pocket doors with steel doors
    • Replace flooring
    • Replace select exterior doors and windows
    • Replace cafeteria and music room ceiling clouds
    • Replace counter tops
    • Replace window coverings
    • Replace restroom partitions and grab bars
    • Repair and replace concrete
    • Replace fire panel
    • Upgrade interior and exterior lighting to LED
    • Commission ventilation systems
    • Tuckpointing
    • Roof replacement
    • Replace chiller

Fairmeadows – Exterior Improvements

Hillside Paving

  • Address 

    713 8th Street
    West Des Moines, IA 50265


    Contact

    PHONE: 515-633-6200 
    FAX: 515-633-6299 


    School Times

    HOURS: 9:05 a.m.-3:55 p.m.
    COLLABORATION SCHEDULE: Wednesdays 9:05 a.m.-3:10 p.m.
    PRESCHOOL: 9:05-11:50 a.m. and 1:10-3:55 p.m.


    Grades Served

    PK-6


    Principal

    Dr. Graham Jones

Last Modified on November 19, 2021