Hillside Construction - May 2004

Through May 27, 2004
Heavy rains over the weekend and first part of this week have slowed site work. Another section of sidewalk in front of the building was poured on May 27. The finish grading work and top soil prep has begun with hopes of seeding a good portion of the south side of the building yet this week. The area along Eighth Street, between Hillside and Walnut Creek, has been seeded. Playground installation continues as soil conditions permit. Taping and floating continues in the east wing. East wing corridors have been primed for painting, as have some of the masonry walls. MDF board is virtually complete on the first floor and is still underway on the second floor of the east wing. All lockers have now been set. Floor tile is being placed in the first floor restroom in the east wing. Still a few drops remain to be placed for the sprinkler contractor. Electrical and plumbing work continues on pace. Prime painting is nearly complete in the west wing and has started in the gym. Much of the ceiling grid for the west wing has been set and some light fixtures installed. A few windows and storefront areas are yet to be completed. The administrative area has been primed to paint. Some sidewalk remains to be poured at the main entrance. Much of the millwork has been set for the west wing. Plumbers will start installing sinks in the near future. While the permanent air conditioning units are not all operational, a temporary air conditioning unit has been installed to help control the humidity throughout the building to allow painting and sheet rock operations to continue.


Through May 20, 2004
Site work and finish grading is proceeding as weather permits. Barring further wet weather, it is expected that the south portion of the site, the area along Eighth Street, and the area between the parking lot and school will be seeded this weekend. Work continues on playground equipment and installing concrete play areas. Most of the sidewalks have been installed with the exception of the main entrance. Grading is underway in that area. Window and door installation is close to completion. Areas that could lead to water penetration have been sealed off so that all other trades can continue to work. The majority of the sheetrock has now been installed and taping and floating has at least one coat completed on the first floor, with that work now starting on the second floor. The majority of the ceiling grid for the west wing has been installed and is now being installed in selected areas of the center wing. Most of the MDF board for the first floor of the east wing has been installed and is underway on the second floor. Installation of lights in classrooms has started in the west wing, as has the installation of millwork. The lockers for the first floor east wing have been assembled and are set in place and that work is also well underway on the second floor of the east wing. A good share of the finish painting in the west wing is complete and prime painting in certain areas on the first floor of the east wing (primarily the corridor) is underway. Grouting of the ceramic tile is being finished in the west wing and tile work in the east wing should start next week. Wiring for technology in the west wing is nearly complete and is underway in both the center wing and east wing of the building. The sprinkler company is finishing drops in selected areas around the school and is nearing completion of this work. Fireplace has now been set in the hearth room. Prime painting has started in the gymnasium. Work continues on the installation of the mechanical and electrical equipment.


Through May 13, 2004

The strike has now ended. It affected some contractors, but not all and it did allow the glazers to get some more windows and doors in place. There are still a few isolated areas on the exterior where the appropriate glass has not been installed. However, those areas are being plugged with plywood and waterproofed to allow the continuation of finish work on the interior. As weather has allowed, finish grading has started with the intent being to seed as soon as possible and not miss the spring seeding window. The majority of the sidewalks (except those next to the building) have now been poured and work is underway on installing playground equipment and the site work associated with that equipment. Finish painting is well underway in the west wing and the ceiling grid has started to be installed in that area. Most of the sheet rock has been hung in the center wing and taping and floating in those areas is well underway. In the east wing, while the corridors have drywall that has been floated and taped, the addition of windows is now allowing the drywall operations to be concentrated on this wing with tapers and floaters to follow. The MDF board is also now being installed in the upper floors of the east wing. Now that the building has permanent power, the elevator work will start soon. There is still some sprinkler work to do in the east wing. Technology cabling is being run in the west wing.

Through May 6, 2004
The strike that started on May 1 continues. However, all of the contractors are not union and some of the work is being done this week. Additional sidewalks have been poured and windows and doorways installed. At present, most of the 2nd floor windows for the classrooms have been installed, with only a few remaining. Work is also underway on the storefront at the dining room and several of the entrances now have doors and windows in place. Starting May 7, a third gate has been created for access to the jobsite for union contractors who have already settled on their contract, thus we are hopeful in getting black dirt spread and graded so that the site can be seeded during this prime seeding time. Permanent power has now been connected to the building. The playground equipment has been delivered and work is underway on preparing the playground areas. Now that a majority of the windows are in place, this should allow for an expanded crew to finish installing drywall and MDF board as soon as the strike is over.

May 26, 2004

East Wing Corridor

East Wing Corridor

West Wing Cubbies

West Wing Cubbies

North Side

North Side of West Wing Entrance

Gym

Gym

Living Room

Living Room Area in West Wing

Playground

Playground Equipment on South Side of West Wing

May 14, 2004

Hearth Room
Hearth Room


Grades K-4 Play Area

Kindergarten
Kindergarten Area

Living rom
Living Room Area

Second Grade
Second Grade Area

5-6 Play Area
Grade 5-6 Play Area

 


About Us | Calendars | Community Education | Construction Plans | Curriculum | Finance | Job Openings | Nutrition | Programs | Registration | Schools | School Board | Technology | Transportation

LINKS FOR Parents | Students | Staff Login | Job Seekers | Campus Portal | Staff Directory | Website Privacy Statement | Search | HOME

West Des Moines Community Schools
3550 Mills Civic Parkway
West Des Moines, Iowa 50265-5556
Phone (515) 633-5000 | Fax (515) 633-5099

Email Us | Email Webmaster